Monday, October 8, 2012

Timeline Explanation

Well, well, well, it's finally that time in my college career that I am outlining my Capstone to maximize my time and my efforts to keep me on track to complete the Fenway Park 3D model on time.

Recently I found out that I would be staying another semester at IUPUI, so my capstone has been pushed back into the Fall of 2013 category, which I will look at as a benefit instead of a hindrance. I am at a stage of my capstone that is crucial and now that I have an extra summer and a semester to work on it, it should be that much better.

Since it is a year away, I had to go with Capstone Timeline form 2. With this being a 3D modelling project it is difficult to outline from the beginning where my stumbling points will be but I tried my best to outline it in a way to maximize the most crucial aspect of the project (the modelling) and to allow myself breathing room along the way not to feel I am running out of time if I stay on task. The timeline is extremely flexible for me in the sense of I can push things back if need be after the modelling stage. Rendering is important but it doesn't necessarily need an entire month in the timeline but I can keep modelling while rendering as well if need be.

The timeline will certainly change along the way and next semester it would certainly be smart of me to create another timeline using the first form and break it down by weeks instead of months. I will say this assignment has definitely kicked my mind into high gear and I am going to get started as soon as I can.

No comments:

Post a Comment